Cold Certification: Difference between revisions

From Claremont MakerSpace
(Add (most) current certification pages)
 
(Increase all header levels in certifications by one)
Line 1: Line 1:
{{Certification|version=0.1.0}}
{{Certification|version=0.1.0}}


== Studio Anatomy ==
=== Studio Anatomy ===


All tools and their appropriate uses can be properly identified.
All tools and their appropriate uses can be properly identified.
Line 19: Line 19:
* Patina and metal cleaning station
* Patina and metal cleaning station


== Pre-Operation ==
=== Pre-Operation ===


* Safety precautions are followed - safety glasses, hair tied back, sweatshirt ties and other loose clothing is secured and out of the way, close toed shoes, etc.
* Safety precautions are followed - safety glasses, hair tied back, sweatshirt ties and other loose clothing is secured and out of the way, close toed shoes, etc.
Line 26: Line 26:
* BurLife is applied to burs and drills on Drill Press and Flex Shaft
* BurLife is applied to burs and drills on Drill Press and Flex Shaft


== Operation ==
=== Operation ===


* Polishing and Buffing wheels are used with appropriate technique and for appropriate applications
* Polishing and Buffing wheels are used with appropriate technique and for appropriate applications
Line 36: Line 36:
* Tumbler is used with appropriate tumbling media, an assembled in the correct order
* Tumbler is used with appropriate tumbling media, an assembled in the correct order


== Post-Operation ==
=== Post-Operation ===


* All work areas are cleaned
* All work areas are cleaned
Line 54: Line 54:
* Cleaning area has been wiped down and tidied
* Cleaning area has been wiped down and tidied


== Lockout/Tagout Procedure ==
=== Lockout/Tagout Procedure ===


* Student imparts: Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified (if on site) and shop lead emailed immediately.
* Student imparts: Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified (if on site) and shop lead emailed immediately.


{{CertificationSignOff}}
{{CertificationSignOff}}

Revision as of 16:49, 25 August 2020

Cold Certification
Version 0.1.0
Approval Date Draft/NOT APPROVED
Prerequisites
Document/Printout Cold Certification
Required For Tools/Shops

Training Check-Off List:

Studio Anatomy

All tools and their appropriate uses can be properly identified.

  • Large Bench Shears
  • DuraBull Polishing & Buffing Machine
  • Mini Belt Sander
  • Tabletop Drill Press
  • Tumbler
  • Calipers, Stencils, and sandpaper
  • Hand Tools (pliers, jewelers saw, files, etc.)
  • Various Hammers (Steel vs. Brass vs. Non-marring)
  • Daps, Dapping blocks, Disc Cutter, and Stamps
  • Hammering Table & Surfaces (Steel & wooden surfaces, mandrels, vices, etc.)
  • Flex Shaft and Bits
  • Jewelers Bench
  • Patina and metal cleaning station

Pre-Operation

  • Safety precautions are followed - safety glasses, hair tied back, sweatshirt ties and other loose clothing is secured and out of the way, close toed shoes, etc.
  • Work stations are cleared where necessary
  • Appropriate compound is chosen and applied for buffing wheel
  • BurLife is applied to burs and drills on Drill Press and Flex Shaft

Operation

  • Polishing and Buffing wheels are used with appropriate technique and for appropriate applications
  • Appropriate careful technique is used for bench shears, drill press, and other machinery
  • Correct technique and application are used with appropriate hammers
  • Flex Shaft is used with correct technique, speed, and control, and appropriate bits are chosen
  • Hand tools are used with correct technique
  • Liver of Sulphur is prepared correctly and used with appropriate precautionary techniques
  • Tumbler is used with appropriate tumbling media, an assembled in the correct order

Post-Operation

  • All work areas are cleaned
  • Bench Shears are closed and locked
  • Jewelers Bench
  • Buffing Machine is OFF and all buffing/polishing wheels and compound are stowed
  • Belt Sander is unplugged
  • Drill Press is unplugged and drill bits are stowed
  • Tumbler and tumbling media are completely dried, and tumbling media is stored in barrel
  • Tumbler is unplugged
  • All hand tools, mandrels, and hammers are put away
  • Disc cutter is stowed in plastic bag
  • Hammering Table is cleared
  • Jewelers benches are swept of debris
  • Flex Shaft is appropriately stowed and attachments are put away
  • LOS has been properly disposed of OR has been saved in jar with lid tightly secured
  • Cleaning area has been wiped down and tidied

Lockout/Tagout Procedure

  • Student imparts: Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified (if on site) and shop lead emailed immediately.