Powermatic Jointer Certification: Difference between revisions

From Claremont MakerSpace
(Add (most) current certification pages)
 
(Increase all header levels in certifications by one)
Line 1: Line 1:
{{Certification|version=0.1.0}}
{{Certification|version=0.1.0}}


== Tool Anatomy ==
=== Tool Anatomy ===


* Parts of the jointer are properly identified
* Parts of the jointer are properly identified


== Pre-Operation ==
=== Pre-Operation ===


* Safety precautions are followed - safety glasses, proper clothing, work area cleared, etc.
* Safety precautions are followed - safety glasses, proper clothing, work area cleared, etc.
Line 12: Line 12:
* Proper push aids are selected
* Proper push aids are selected


== Operation ==
=== Operation ===


* Dust collector is used properly
* Dust collector is used properly
Line 20: Line 20:
* Material is fed properly
* Material is fed properly


== Post-Operation ==
=== Post-Operation ===


* Work area is cleaned
* Work area is cleaned


== Lockout/Tagout Procedure ==
=== Lockout/Tagout Procedure ===


* Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified.
* Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified.


{{CertificationSignOff}}
{{CertificationSignOff}}

Revision as of 16:50, 25 August 2020

Powermatic Jointer Certification
Version 0.1.0
Approval Date Draft/NOT APPROVED
Prerequisites
Document/Printout Powermatic Jointer Certification
Required For Tools/Shops

Training Check-Off List:

Tool Anatomy

  • Parts of the jointer are properly identified

Pre-Operation

  • Safety precautions are followed - safety glasses, proper clothing, work area cleared, etc.
  • Stock is checked for issues/problems
  • Supports or trained assistants are available to help with outfeed if necessary
  • Proper push aids are selected

Operation

  • Dust collector is used properly
  • Proper body position
  • Infeed table is adjusted properly
  • Fence depth is set properly
  • Material is fed properly

Post-Operation

  • Work area is cleaned

Lockout/Tagout Procedure

  • Tool unplugged and plug wrapped in safe/visible location, tag filled out and posted, front desk notified.